Friday, May 8, 2009

Assemble a kit of parts --- advanced

Building construction projects requires putting together a lot of parts.

One of the time wasters in the field is having skilled craftsmen spending time looking for the right parts, dealing with missing parts, waiting for parts, etc.

The proven solution to parts management is kits. Assembling all of the parts needed into a single reliable "kit of parts" that includes all that is required. Kits should include everyting required including hardware, adhesives, lubricants, etc.

The objective should be to have the craftsman focus on the installation with little or no effort required searching for the right parts.

Kits can be assembled off-site in central locations that are set up and have the right resources for assembling kits for many projects. In this way, the minimum labor is required since the kits are assembled efficiently and the workers in the field are also productive.

No comments:

Post a Comment